Disclosure

Disclosure (2011)

Disclosure (2010)

Disclosure of Valuation (2002)
Line Charge Disclosures

Schedule of Charge Variations - from April 1st 2011

Line Charge Methodology (March 2011)
Asset Management Plan Pursuant to Section 7 of the Electricity Distribution (Information Disclosure) Requirements 2008.

Asset Management Plan (March 28th 2011)
The Network Waitaki Limited Asset Management Plan covering the period 1 April 2011 to 31 March 2021 is available for public disclosure. The plan will be reviewed annually and updated as necessary.
Go to Industry Submissions - Making a Submission Page
Participant Outage Plan Network Waitaki’s Participant Outage Plan has been approved by the Electricity Commission.

Participant Outage Plan (2010)
Under the Electricity Governance (Security of Supply) Regulations 2008, all electricity distributors are required to prepare a Participant Outage Plan. This document, which must be consistent with the Electricity Commission's Security of Supply Outage Plan, is required as a plan for managing severe energy shortages - although these are highly unlikely - and must include details of how rolling outages would be planned and implemented.
Rolling power outages are a last resort measure for managing severe energy shortages. Under normal conditions they should not be necessary, but it is prudent to plan for contingencies where they may be required.
Annual Report

Annual Report (2011)
Network Development Plan

Under revision - available soon
Optimal Deprival Valuation (ODV) Report

Under revision - available soon

Go to the Document Archive for pre-current documentation
Go to the Corporate Information page
|